The building facade below is what will go above and behind the Convenience Store front. I still have one more floor to build then the trim has to be painted. Everything is really crooked right now because nothing is glued down yet.
I just couldn't wait to see the test shots.
I also built a screen door, there will be two balconies and a screen door for each.
The bottom floor will have a door in the middle that opens onto the roof of Frosty's Convenience.
Once this is done I still have one more piece to add, a doorway with a hall attached to it on the side of Frosty's. Apparently the top of the building is much wider than I predicted.
So instead of scraping the project I decided to work around it. The doorway will be the back entrance to the apartment building above.
Not sure how tall this will be when it is done, well over 4' I guess.